Saturday, October 5, 2013

Incheon Airport New Terminal 2

Incheon Airport Terminal 2
- open by 2018 Pyeongchang Winter Olympics
- 72 gates, to be completed in 2 phases
- 681,431m2
- Cost $2.5 billion
- Designed by Heerim-Mooyoung-Gensler-Yungdo (HMGY) consortium

Source: WSJ Blog, Airport World


Click here for the 4min video that was shown at the Trinity Forum 2012.  Excellent visuals and overview of the new Terminal 2. 


Incheon Terminal 2

Road and Rail Connections


Inter Terminal Connections

APM Connections between T1 and T2




Terminal 2
Source: Moodie Report Youtube channel, Incheon Airport



1 comment:

  1. Some details about Incheon airport Terminal 2 The total size of the terminal will be 7.4 million square foot. The design for the terminal was finalised in June 2012. It is expected create about 93,000 jobs and KRW17trn ($15.8bn) worth of economic benefits.

    The Incheon International Airport terminal design will be based on the concept of Bonghwang (Korean Phoenix), a Korean mythological beast symbolising authority, longevity, strength and balance. It will be constructed based on Korean design patterns representing Korean culture and traditions.

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...